W۰RE

Arding & Hobbs, Clapham Junction
The sensitive restoration, refurbishment and extension of the iconic Grade II listed Arding & Hobbs department store in Clapham Junction.
W۰RE
Sector: Leisure, Retail + Hospitality
Client: Arding and Hobbs
Architect: Stiff + Trevillion
Quantity Surveyor: Exigere
Engineering: AKT II; Norman Disney & Young
Project Manager: Blackburn & Co
Size: 107,000 sq ft
Procurement: 2-Stage Tender. Design and Build

Project Overview


Built in 1910 and located opposite one of Europe’s busiest railway stations, Arding & Hobbs has been carefully restored to create leisure, retail and office spaces with a new rooftop pavilion.

The refurbishment seamlessly blends the preservation of the historic facade and window elements with the addition of a contemporary rooftop pavilion.

The building’s iconic cupola, visible in the background, was restored during the renovation.

The pavilion’s roof is engineered using a diagrid of glulam (glued laminated timber) beams and a cross-laminated timber (CLT) deck.

Generous ceiling heights, exposed services and CLT structure create a light-filled, contemporary workspace.

The building has been thoughtfully transformed to deliver contemporary, flexible spaces while respecting and celebrating its historic character.

The renovated ground floor reception, featuring a prominent terrazzo floor.

The design features a new timber-wrapped central core intended to bring natural light into the building.

The retrofit transition achieved a BREEAM Excellent rating. It functions with an all-electric HVAC system that operates carbon-neutrally.

Light fills the new top floor extension.

The new bespoke reception desk.

The refurbished bathrooms reflect the wider transformation of the building, with contemporary finishes and improved functionality.

Restored sliding doors, finished in a vibrant yellow.

Swipe to explore past and present.

We hope that the work we have done will give this Grade II listed building another lease of life and cement its place in the heart of Clapham Junction.”

Lance Routh, Director at Stiff + Trevillion

Planning + Construction


Completed in 2023, Arding & Hobbs was delivered utilising a number of innovative construction techniques.

A timelapse of the construction.

Artist's interpretation of the scheme.

Visualisations that translate seamlessly from CGI to reality, with the completed scheme delivered as designed.

Honeycombed bronze alloy rainscreen cladding / Careful strip‑out works revealed a beautiful stained glass rooflight, previously hidden under layers of paint.

The clock in the iconic cupola was restored to its former glory.

Installation of the curtain walling for the new roof extension.

3D phasing visualisation of the build sequence.

Project drawings from the preconstruction stage.

Project Details + Credits


S+T
Project Architects:

Stiff + Trevillion

Stiff + Trevillion is a London-based architecture and interior design studio known for its elegant, contemporary work across residential, commercial, and hospitality sectors. The practice is recognised for its refined use of materials, attention to detail, and ability to deliver context-sensitive designs that balance creativity with practical, high-quality outcomes.

Further Project Information:


Related Stories

More Projects
DJI_0279

Private Client

Hampstead Heath, London

Originally built in 1872, this large Victorian house in the Hampstead Heath conservation area has undergone a major restoration and extension scheme.

BAFTA

BAFTA

Piccadilly

The comprehensive refurbishment and expansion of BAFTA’s Grade II listed headquarters at Piccadilly.

250910_100GeorgeSt_©JackHobhouse_071

Derwent London/ Native Land

100 George Street, Marylebone, London

The fit out of 41 high quality apartments in a new building in the heart of Marylebone, at the junction of George Street and Baker Street.

Let's bring your vision to life...

Get In Touch