Old Park Lane Management
A complex office refurbishment in Mayfair with a new two storey glulam and CLT structure forming a 7th floor and green roof.
Sector:
Commercial
Project Manager:
CO-RE
Client:
Old Park Lane Management
Quantity Surveyor:
Vibe
Architect:
John Robertson Architects
Engineering:
Evolve | Hilson Moran
A complex two storey office refurbishment and extension in Mayfair using innovative timber techniques. The scheme involves replacing the top two floors of an existing building and erection of a new glulam and CLT structure to form a new 7th floor and green roof.
Externally new terraces and façade enhancements will include stone façade cleaning and replacement of existing glazing. SFS anodized cladding and brick-slips will be installed to the newly formed elevations.
Internally structural modifications will be carried out to the lower floors including staircase repositioning and alterations to existing slabs. A newly configured reception entrance, and fit out to Cat A and shell and core will complete the scheme.